Starting Date (estimated): N/A
Location: LAKE COUNTRY (BC)
Size:
$19,600,000.00
Stage: 3-Planning or drawing
Published: 2025-10-21
Last Update: 2025-10-21
Work type: New construction
Sector: Private
Category:
4-Residential
Subcategorie:
4B-Residential Development
Disciplines: Architecture, Civil, Electricity, Equipment, HVAC, Building mechanic, Structural, Other
NEW MIXED-USE RESIDENTIAL PROJECT
Located in Lake Country, 9971 Okanagan Centre Rd. E, this project estimated at $19 600 000 is in the planning stage. Works concern the phased construction of a housing project with recreational facilities which include a racquet club.
Initiator: INFORMATION AVAILABLE TO SUBSCRIBERS
Starting Date (estimated): 2027-06
Location: GRANDE PRAIRIE (AB)
Size:
$6,174,000.00
Stage: 2-Planning
Published: 2025-10-20
Last Update: 2025-10-20
Work type: Expansion / Addition
Sector: Public
Category:
3-Institutional
Subcategorie:
3A-Educational
Disciplines: Architecture, Electricity, Equipment, HVAC, Building mechanic, Structural, Other
EDUCATIONAL FACILITY EXPANSION
Located in Grande Prairie, 20 Knowledge Way, this project (Charles Spencer High School) estimated at $6 174 000 is slated to begin in June 2027. It is in the initial stage. Works concern an expansion of an existing high school to house 200 more students.
Initiator: INFORMATION AVAILABLE TO SUBSCRIBERS
Starting Date (estimated): 2026-09
Location: COQUITLAM (BC)
Size:
$14,160,000.00
Stage: 2-Planning
Published: 2025-10-20
Last Update: 2025-10-20
Work type: Expansion / Addition
Sector: Public
Category:
3-Institutional
Subcategorie:
3A-Educational
Disciplines: Architecture, Electricity, Equipment, HVAC, Building mechanic, Structural, Other
EDUCATIONAL FACILITY EXPANSION
Located in Coquitlam, 600 Fairview St., this project (Roy Stibbs Elementary School) estimated at $14 160 000 is slated to begin in September 2026. It is in the initial stage. Works concern an 8-classroom addition to an elementary school.
Initiator: INFORMATION AVAILABLE TO SUBSCRIBERS
Starting Date (estimated): 2028-11
Location: HALIFAX (NS)
Size:
$388,200,000.00
Stage: 2-Planning
Published: 2025-10-20
Last Update: 2025-10-20
Work type: New construction
Sector: Public
Category:
3-Institutional
Subcategorie:
3B-Municipal & Government Buildings
Disciplines: Architecture, Electricity, Equipment, HVAC, Building mechanic, Structural, Other
NEW POLICE HEADQUARTERS
Located in Halifax, this project (Halifax Regional Police Headquarters) estimated at $388 200 000 is slated to begin in November 2028. It is in the initial stage. Works concern the construction of a new central police headquarters.
Initiator: INFORMATION AVAILABLE TO SUBSCRIBERS
Starting Date (estimated): 2026-05
Location: CHATHAM (ON)
Size:
$71,990,000.00
Stage: 4-Drawing
Published: 2025-10-20
Last Update: 2025-10-20
Work type: Renovation / Alterations / Modernization
Sector: Private
Category:
1-Industrial
Subcategorie:
1K-Metal Industry
Disciplines: Architecture, Electricity, Equipment, HVAC, Instrumentation, Building mechanic, Industrial mechanic, Structural, Other
METAL CANS MANUFACTURING PLANT RENOVATION
Located in Chatham, this project (Ideal Can Inc.) estimated at $71 990 000 is in the planning stage. The preliminary design is underway. It is slated to begin in May 2026 and be completed in March 2027. Based on a surface of 154 776 sqft, works concern building renovations and structural modifications to an existing facility. The project includes the installation of new metal food can production lines and systems, aiming to boost production capacity to 600 million cans annually.
Initiator: INFORMATION AVAILABLE TO SUBSCRIBERS
Initiator: INFORMATION AVAILABLE TO SUBSCRIBERS
Initiator: INFORMATION AVAILABLE TO SUBSCRIBERS
Starting Date (estimated): 2029-06
Location: HAMILTON (ON)
Size:
$351,900,000.00
Stage: 2-Planning
Published: 2025-10-20
Last Update: 2025-10-20
Work type: Expansion / Addition
Sector: Private
Category:
1-Industrial
Subcategorie:
1Q-Chemicals & Oil Products
Disciplines: Architecture, Civil, Electricity, Environment, Equipment, HVAC, Instrumentation, Building mechanic, Industrial process, Structural, Other
BATTERY ANODE MATERIAL MANUFACTURING PLANT EXPANSION
Located in Hamilton, 725 Strathearne Ave. N, this project (Rain Carbon Inc. & Northern Graphite Corp.) estimated at $351 900 000 is in the preliminary stage. A pre-feasibility study is underway. It is slated to begin in June 2029 and be completed in June 2031. Based on a surface of 28 138 sqft, works concern the construction of a new development facility. The plant will include pilot-scale processing capabilities for carbon and carbon precursors to create advanced anode materials for lithium-ion batteries.
Initiator: INFORMATION AVAILABLE TO SUBSCRIBERS
Initiator: INFORMATION AVAILABLE TO SUBSCRIBERS
Initiator: INFORMATION AVAILABLE TO SUBSCRIBERS
Starting Date (estimated): 2026-04
Location: BRAMPTON (ON)
Size:
$1,225,000.00
Stage: 4-Drawing
Published: 2025-10-20
Last Update: 2025-10-20
Work type: Renovation / Alterations / Modernization
Sector: Private
Category:
1-Industrial
Subcategorie:
1K-Metal Industry
Disciplines: Architecture, Electricity, Equipment, HVAC, Instrumentation, Building mechanic, Industrial mechanic, Structural, Other
SECONDARY ALUMINUM SMELTER RENOVATION - 2026
Located in Brampton, 850 Intermodal Dr., this project (Matalco Inc.) estimated at $1 225 000 is in the planning stage. It is slated to begin in April 2026 and be completed in October 2026. Based on a surface of 100 072 sqft, works concern refractory rebuilds and repairs to improve operations at a secondary aluminum smelter with a capacity of 250 million pounds per year. The project targets two (2) 10 MMBtu/hr natural gas-fired melting furnaces and one (1) 20 MMBtu/hr tilting casting furnace.
Initiator: INFORMATION AVAILABLE TO SUBSCRIBERS
Initiator: INFORMATION AVAILABLE TO SUBSCRIBERS
Initiator: INFORMATION AVAILABLE TO SUBSCRIBERS
Starting Date (estimated): 2026-07
Location: GUELPH (ON)
Size:
$1,620,000.00
Stage: 2-Planning
Published: 2025-10-20
Last Update: 2025-10-20
Work type: Renovation / Alterations / Modernization
Sector: Private
Category:
1-Industrial
Subcategorie:
1A-Agri-Food
Disciplines: Architecture, Electricity, Environment, Equipment, HVAC, Instrumentation, Building mechanic, Industrial process, Structural, Other
MEAT PROCESSING PLANT UPGRADE
Located in Guelph, 165 Dunlop Dr., this project (Cargill Proteins) estimated at $1 620 000 is in the preliminary stage. A market analysis is currently underway. It is slated to begin in July 2026 and be completed in September 2026. Based on a surface of 157 867 sqft, works concern automation upgrades to the packaging lines of a beef processing plant. This involves the installation of a new automated case packer or palletizer machine along with auxiliary equipment.
Initiator: INFORMATION AVAILABLE TO SUBSCRIBERS
Initiator: INFORMATION AVAILABLE TO SUBSCRIBERS
Initiator: INFORMATION AVAILABLE TO SUBSCRIBERS
Starting Date (estimated): N/A
Location: SHERBROOKE (QC)
Size:
$19,310,000.00
Stage: 4-Drawing
Published: 2025-10-20
Last Update: 2025-10-20
Work type: New construction
Sector: Private
Category:
2-Commercial
Subcategorie:
2E-Hotel & Lodging
Disciplines: Architecture, Electricity, HVAC, Building mechanic, Structural, Other
CONSTRUCTION D'UN HÔTEL
Situé à Sherbrooke, ce projet (Quartier Santé, Hôtel), évalué à 19 310 000 $, est à l'étape des plans et devis. Il devrait se terminer en 2026. Le projet est en cours de planification et est conditionnel à l'obtention des permis nécessaires. Les travaux visent la construction d'un nouvel hôtel de 105 chambres, chacune équipée d'une cuisinette.
Initiateur: INFORMATION AVAILABLE TO SUBSCRIBERS
Initiateur: INFORMATION AVAILABLE TO SUBSCRIBERS
Starting Date (estimated): 2026-09
Location: COQUITLAM (BC)
Size:
$15,370,000.00
Stage: 2-Planning
Published: 2025-10-17
Last Update: 2025-10-17
Work type: Expansion / Addition
Sector: Public
Category:
3-Institutional
Subcategorie:
3A-Educational
Disciplines: Architecture, Electricity, Equipment, HVAC, Building mechanic, Structural, Other
EDUCATIONAL FACILITY EXPANSION
Located in Coquitlam, 1195 Lansdowne Dr., this project (Gleneagle Secondary School) estimated at $15 370 000 is slated to begin in September 2026. It is in the initial stage. Works concern the 8-classroom expansion of a secondary school.
Initiator: INFORMATION AVAILABLE TO SUBSCRIBERS
Stemming from various sources, the information received from CCD is both verified and considered true and correct for publication. In spite of these precautions, errors of human interpretation are regrettably possible and inevitable. In such cases, CCD will only assume responsibility for the necessary corrections, upon receipt of written notice concerning the errors in question. Note that sources will not be revealed, as some information received by CCD is confidential.
Below is the list of the most popular projects viewed over the last month (prorated by province):